AMRC P&L Curve
Ameresco, Inc. (AMRC) operates in the Industrials sector, specifically the Engineering & Construction industry, with a market capitalization near $1.53B, listed on NYSE, employing roughly 1,500 people, carrying a beta of 2.55 to the broader market. Ameresco, Inc. Led by George Sakellaris, public since 2010-07-22.
A profit/loss curve charts the theoretical gain or loss of an options position across a range of underlying prices. It helps traders visualize risk, identify breakeven points, and compare strategies before committing capital.
- Exchange
- NYSE
- Sector
- Industrials
- Industry
- Engineering & Construction
- Market Cap
- $1.53B
- Employees
- 1.5K
- IPO Date
- 2010-07-22
- CEO
- George Sakellaris
- Beta
- 2.55
At the current $33.41 spot price with 81.3% ATM implied volatility and 34 days to the front expiration, an at-the-money long straddle carries an approximate combined premium near $6.63, producing breakevens at roughly $26.78 and $40.04. Market-implied 1-standard-deviation range extends from $25.62 to $41.20, which sets the relevant P&L evaluation window for most near-term strategies. Payoff diagrams should be rebuilt from the live options chain; the preceding values are illustrative and assume a single at-the-money straddle for reference.
Frequently asked AMRC pl curve questions
- What does a AMRC ATM straddle cost today?
- Using current AMRC pricing (81.3% ATM IV, 34-day front expiration, $33.41 spot), an at-the-money long straddle (long call + long put at the same strike) carries an approximate combined premium near $6.63 per spread. Breakevens land at roughly $40.04 on the upside and $26.78 on the downside. The estimate uses the Brenner-Subrahmanyam approximation for at-the-money options under Black-Scholes.
- How do I read an options P&L curve?
- An options P&L curve plots theoretical position value at expiration (or at any chosen evaluation date) against the underlying price. The X-axis is the underlying price scenario, the Y-axis is position dollar P&L. The shape of the curve tells you the strategy's directional sensitivity, breakeven points, maximum profit and loss levels, and where time decay or volatility shifts will be most impactful. Multi-leg structures combine the curves of the individual legs to produce composite payoff diagrams.
- What's the difference between a P&L curve and a payoff diagram?
- Strictly: a payoff diagram shows option value at expiration (no time premium left), while a P&L curve typically shows position value at any evaluation date (with remaining time premium). The expiration payoff diagram has kinks at the strikes; the early P&L curve is smooth. For directional-vega trades, the early P&L curve also responds to IV shifts that the expiration payoff diagram does not capture - which is why options traders often look at both views.
- Why are illustrative AMRC P&L numbers approximate?
- The numbers above use Black-Scholes assumptions (lognormal returns, constant volatility, no early exercise, no dividends). Real-world option prices reflect skew, term structure, jump risk, and (for US-style options) early exercise premium. Use the live options chain for actual quoted bid/ask prices when sizing trades; the values here illustrate magnitude only.